Hospital

New S. Salvatore Community Hospital

Tolentino (MC) - 2021

Browse projects

Icona a lente

Minimization of construction times

The project involves the demolition of the Tolentino Hospital, damaged by the earthquake, and the construction of a New Community Hospital. The project was developed pursuing some main objectives: [1] minimization of construction times, through the management of the demolition and reconstruction phases, aimed at minimizing construction time, also the need to not to interrupt the outpatient service; [2] distribution functionality and flow separation, also taking into consideration the management of any further infectious events such as COVID-19; [3] optimization of construction / maintenance / management costs, through the choice of highly durable and low maintenance materials; [4] structural safety, with particular attention paid to seismic behavior; [5] architecture-systems integration, through solutions that combine energy, functional and aesthetic needs.

Additional information and dimensional data

Place

Tolentino (MC)


Typology

Ospedale


Year

2020 - 2021


Size

Surface area: 13,500 m2
40 beds


Client

Azienda Sanitaria Unica Regione Marche


Services performed

Design Development Project, Final Design Phase


Collaborations

PLAN Ingegneria Soc. Coop.
All Ingegneria Studio Associato
Studio TI S.r.l.
ARCHISAL Studio Salmoni Architetti Associati