Minimization of construction times
The project involves the demolition of the Tolentino Hospital, damaged by the earthquake, and the construction of a New Community Hospital. The project was developed pursuing some main objectives: [1] minimization of construction times, through the management of the demolition and reconstruction phases, aimed at minimizing construction time, also the need to not to interrupt the outpatient service; [2] distribution functionality and flow separation, also taking into consideration the management of any further infectious events such as COVID-19; [3] optimization of construction / maintenance / management costs, through the choice of highly durable and low maintenance materials; [4] structural safety, with particular attention paid to seismic behavior; [5] architecture-systems integration, through solutions that combine energy, functional and aesthetic needs.
Additional information and dimensional data
Place
Tolentino (MC)
Typology
Ospedale
Year
2020 - 2021
Size
Surface area: 13,500 m2
40 beds
Client
Azienda Sanitaria Unica Regione Marche
Services performed
Design Development Project, Final Design Phase
Collaborations
PLAN Ingegneria Soc. Coop.
All Ingegneria Studio Associato
Studio TI S.r.l.
ARCHISAL Studio Salmoni Architetti Associati